Connecting the world with professional
Fiber Optic Solutions

fiber optic transceiver special topic

Certificate

FCC

 

CE

 

ROHS

Guarantee

Except products belongs to Bargain Shop section, all products are warranted by SOPTO only to purchasers for resale or for use in business or original equipment manufacturer, against defects in workmanship or materials under normal use (consumables, normal tear and wear excluded) for one year after date of purchase from SOPTO, unless otherwise stated...

Return Policies

Defective products will be accepted for exchange, at our discretion, within 14 days from receipt. Buyer might be requested to return the defective products to SOPTO for verification or authorized service location, as SOPTO designated, shipping costs prepaid. .....

Applications

sopto help you fiber to the home

 

Sopto supply the best FTTH solutions for your network!

 

SNS Page

  • sopto facebook
  • sopto twitter
  • sopto linkedin

Choosing Optimal Amount of Fibers to be Laid in FTTx

 

 

The largest cost for the network structure is the deployment of the fibers and other equipment. The largest component of deployment is the construction, and it cost can have great impact on the overall cost. On the analysis stage of outside plant the required materials, components, labor costs for the aerial and underground deployments should be calculated. Based on this information the most cost efficient place should be determined.

 

It should be noted that cost would be different not only from city to city, but even from neighborhood to neighborhood. The costs would vary depending on the structure density and if either aerial or underground plant is chosen. Optimal engineering design should be flexible enough to be adjusted to any strategy chosen for the network.

 

Mechanical Splice

Mechanical Splice

 

If we think about the optimal location for the termination point, it should be between 700 and 900 potential end users. In a high density area that number would be more than 1500 and in large metro area it would be over 5000.

 

The ‘First Mile’

Figure 1. The ‘First Mile’

 

Let’s decide for simplicity, that each subscriber line and at the property line of every potential subscriber. The fibers would be placed up to the property line for every residence and business. For the cost reduction the distribution network is run only on one side of the street, with lines that would be crossing the street if there is some property. During engineering, the amount of splices per subscriber is calculated, and if the design requires more than one splice per home - the design will be most likely revised.

 

Designer should note that even if the PON network is chosen for today deployment, the design should be flexible enough to change to the active design, if it would be required in the future.

 

For more info, please browse our website. For purchasing more fiber optic assembly products, please contact a Sopto representative by calling 86-755-36946668, or by sending an email to info@sopto.com.